Clachan Windfarm - appeal imminent

A general forum to discuss any issues involving our community

Moderator: Herby Dice

Post Reply
User avatar
NickB
Site Admin
Posts: 2514
Joined: Mon Dec 15, 2003 10:18 pm
Location: Cloud Cuckoo Land (or so I'm told by some)
Contact:

Clachan Windfarm - appeal imminent

Post by NickB »

.
I have been informed that an appeal against the refusal for planning permission in respect of the wind farm at Clachan Seil is due to be lodged imminently. Apparently a key factor in the appeal will be the alleged ability of the developer to gain access to the site having regard to the pinch point at Kilninver Bridge. I gather that Kilninver Estate have written to the Planning Office to confirm that they will not be providing any assistance in this respect.

If people could use this thread to post any information as it becomes available rather than start yet another discussion on windfarms in general that would be appreciated.
NickB
(site admin)
carbonfreeseil
Posts: 5
Joined: Sun May 09, 2010 4:59 pm

Re: Clachan Windfarm - appeal imminent

Post by carbonfreeseil »

Access will be by barge/sea with a short accessroad built over an existing (old) farm road.
Pentlandpirate

Re: Clachan Windfarm - appeal imminent

Post by Pentlandpirate »

So if you can't get it approved through the 'front door' then try sneaking it round by the back door? That will really endear Mr Young to the local community. So much for this being a community minded project.
User avatar
DonnieC
Posts: 226
Joined: Tue Jul 11, 2006 2:28 pm
Location: clachan seil

Re: Clachan Windfarm - appeal imminent

Post by DonnieC »

Carbon, Do you know is the access to be gained on the north or south side of Clachan Bridge? I'm assuming, if a barge is being used, then the narrows and shallows of Seil and/or Clachan Sounds will be navigated?
Don't Blame Me - I voted YES!
User avatar
NickB
Site Admin
Posts: 2514
Joined: Mon Dec 15, 2003 10:18 pm
Location: Cloud Cuckoo Land (or so I'm told by some)
Contact:

Re: Clachan Windfarm - appeal imminent

Post by NickB »

DonnieC wrote:Carbon, Do you know is the access to be gained on the north or south side of Clachan Bridge? I'm assuming, if a barge is being used, then the narrows and shallows of Seil and/or Clachan Sounds will be navigated?
The largest tower section would be 22m long. I find it unlikely that there is anyway anything that size can be towed under the bridge, and I imagine the moorings owners in the Sound would be somewhat alarmed. The alternative, access from the North end, would surely be limited to a very short period of time either side of high water. I can't visualise anywhere other than Clachan Sound that fits the description given by CarbonFreeSeil though.

Unless it's Barnacarry?
NickB
(site admin)
User avatar
DonnieC
Posts: 226
Joined: Tue Jul 11, 2006 2:28 pm
Location: clachan seil

Re: Clachan Windfarm - appeal imminent

Post by DonnieC »

Nick, There was speculation that equipment would be moved to the site through Raera Forest. I don't know, however, what Kilninver Estate's interest/ownership is, if any, in the Forest as a whole.

Is the appeal visible on any website?
Don't Blame Me - I voted YES!
User avatar
Gavin Rae
Posts: 143
Joined: Sat Jan 29, 2011 8:25 am

Re: Clachan Windfarm - appeal imminent

Post by Gavin Rae »

Windfarm Tower Construction

Don't forget that with towers over 20 metres the upright can often be bolted together in 6 to 10 metre lengths to overcome difficult access ,construction, or transport issues into remote sites

Whilst it is not a favoured method by windfarm engineers it does happen :!:

Snoman
sNOman
User avatar
NickB
Site Admin
Posts: 2514
Joined: Mon Dec 15, 2003 10:18 pm
Location: Cloud Cuckoo Land (or so I'm told by some)
Contact:

Re: Clachan Windfarm - appeal imminent

Post by NickB »

snoman wrote:Windfarm Tower Construction

Don't forget that with towers over 20 metres the upright can often be bolted together in 6 to 10 metre lengths to overcome difficult access ,construction, or transport issues into remote sites

Whilst it is not a favoured method by windfarm engineers it does happen :!:

Snoman
You may be right. I got the tower dimensions from an erection of the same turbine in Orkney where the tower sections were 22m
NickB
(site admin)
User avatar
NickB
Site Admin
Posts: 2514
Joined: Mon Dec 15, 2003 10:18 pm
Location: Cloud Cuckoo Land (or so I'm told by some)
Contact:

Re: Clachan Windfarm - appeal imminent

Post by NickB »

.
Latest news is that apparently no appeal has been lodged within the allowed timeframe.
NickB
(site admin)
User avatar
NickB
Site Admin
Posts: 2514
Joined: Mon Dec 15, 2003 10:18 pm
Location: Cloud Cuckoo Land (or so I'm told by some)
Contact:

Re: Clachan Windfarm - appeal imminent

Post by NickB »

.
In case you have not seen the Oban Times, there is an article on Page 3 which appears to confirm that no appeal has been submitted and that the deadline has passed.

It also says that this has been confirmed by an official of the Scottish Executive.
NickB
(site admin)
Post Reply

Who is online

Users browsing this forum: No registered users and 0 guests